1105 West Peachtree Mixed-Use Development

Atlanta, GA
  • 1,750,000 sq ft
  • $550 million
  • 31 stories
  • September 2021

Structural Features

  • To bridge over the existing underground MARTA subway tunnel, over 13 major transfer grade beams supported on drilled piers foundations were designed to support 33 columns and 3 shear walls of the residential and hotel towers and the parking podium. The long span, variable dimension transfer girders are reinforced using bonded post-tensioning reinforcement for added durability.
  • The office tower includes a 420 foot tall facade exoskeleton with secondary exoskeletons on the parking podium facade.
  • The office, hotel, and residential towers are interconnected through a shared one-acre landscaped amenity plaza located above structured parking and includes outdoor and indoor swimming pools.
  • The typical office building floor offers 27,000 sf of efficient, column-free space.

Awards

Engineering Excellence Honor Award, 2022
American Council of Engineering Companies of Georgia (ACEC Georgia)

Outstanding Project – New Building Over $25 M Category, 2022
Structural Engineers Association of Georgia (SEAOG)

1st Place Mixed-Use Project, 2021
American Concrete Institute (ACI), Georgia Chapter

Development of Excellence Award – Commercial and Mixed-Use Category, 2023
Urban Land Institute (ULI), Atlanta