NAVFAC - MMA/P-8A Integrated Training Center
Jacksonville, FL
- 165,000 sq ft
- Tilt-up structure
- 2 stories
- Completed in 2011
Structural Features
- To help speed up construction, tilt-up, insulated concrete walls were chosen for the structural framing.
- Each simulator imparted large forces on their foundations. Uzun + Case carefully analyzed and designed foundation for the loadings.
- The building includes a data center with raised access floors.