Cast-in-place concrete was selected as the most economical material to achieve the unique tower profile, created by the floor plates gently shifting away from the river as the tower ascends.
Concrete shear walls transfer lateral loads and are exposed throughout the building to enhance the historic ambiance of the development.
At the top two levels, the floor plate framing is designed to accommodate future connections with a substantial skybridge linking a future-phase office tower.
The office tower is amenity-packed with 8,000 sf of ground floor retail, Class-A office space, abundant outdoor spaces, waterfront views at all levels, and proximity to Nashville’s desirable Germantown.