Trilith LIVE

Fayetteville, GA
  • 530,000 sq ft
  • $145 million
  • 5 stories
  • Completed in 2025

Structural Features

  • Located adjacent to the Trilith film studios, the megaplex serves as an extension of the studio campus functioning as its state-of-the-art showroom.
  • The five-story development includes a 2,200-seat auditorium with full backstage support facilities, nine-screen luxury cinema, office, worship and educational spaces, and a dramatic central atrium that connects these building components.
  • To support the project’s diverse and high-demand performance programing, a hybrid structural system was designed utilizing a concrete podium with steel-framed upper levels.
  • The steel designs at upper levels provide exceptional flexibility to realize the architectural vision, which includes a high-volumne clerestory entry, curvilinear balconies, long-span roof systems, flexible stage rigging, and large gathering spaces.
  • Project scope also includes the 7-level cast-in-place parking deck.