This new state-of-the-art training facility includes an indoor 140-yard x 80-yard synthetic turf football field, batting cages, and 65-meter track and field training area.
To achieve the required spans and clearances, 70-foot-tall columns and 200-foot-long custom steel roof trusses were designed for the facility.
Uzun + Case worked closely with the architect to create an exposed structure that was both economical and elegant.